Ski Resorts News
03/19/2018
The existing Kohlmais cable car (built in 1989) at the Skicircus Saalbach will be converted into a modern 10-passenger gondola lift. The new middle station will be built 30 metres to the west of the current station, making it possible to begin construction already.

According to representatives at the ski resort, there will also be a new underground car park with 100 parking spaces installed at the valley station in Saalbach, as well as a new garage for the piste bashers. The new Kohlmaisgipfelbahn will have a capacity of 4200 passengers per hour and the ride to the Kohlmaiskopf at 1794m will take just under 7 minutes.

The grand opening of the new Kohlmaisgipfelbahn is projected for December 2018. In total, 30 million euros will be invested in the project. The construction is already well underway. At the time of writing, the three-storey middle station, begun in the summer, was almost complete.

Latest Resort News
Helmissimo: A New 10-Seater Gondola Set to Transform the 3 Zinnen Dolomites Ski Area
The 3 Zinnen Dolomites ski area in South Tyrol, Italy, is preparing for a major infrastructure upgrade ahead of the 2026/2027 winter season. The new HELMISSIMO 10-seater premium gondola in Versciaco will bring faster access to Monte Elmo (Helm), increase lift capacity and improve the overall skiing experience.
11/06/2026
La Clusaz Unveils New Six-Seater Balme Chairlift for the 2026–2027 Ski Season
La Clusaz, one of the most popular ski resorts in the French Alps, is preparing a major upgrade to its mountain infrastructure with the installation of a brand-new six-seater detachable chairlift in the iconic Balme sector. The new lift, built by French manufacturer POMA, is set to transform access to one of the resort's most spectacular high-altitude skiing areas for the 2026–2027 winter season.
11/04/2026
L’Alpe du Grand Serre Saved: 30-Year Deal and Investment
L’Alpe du Grand Serre, one of the oldest ski resorts in the French Alps, has been saved from permanent closure after signing a 30-year operating agreement with SATA Group. The deal, signed on 30 September 2026, secures the resort’s long-term future and paves the way for its reopening on 19 December 2026. With investments of up to €17 million planned, the resort near Grenoble is preparing for a new chapter in its history.
11/03/2026